Entries by Gestor

What is it and how does the Mains/Genset switching work?

Mains/Genset switching is a key process in the installation of gensets, ensuring continuous power supply during grid failures. This mechanism is essential in critical sectors, where a lack of electricity can cause serious problems. In this article, we explain in detail what Mains/Genset switching is, the different types of systems, and how to choose the […]

We supply power to CECOEL, the Big Brother of Spain’s grid.

The CECOEL (Electricity Control Centre) controls every inch of the national electricity grid to ensure that the supply is perfect. This organisation, dependent on Red Eléctrica, has its headquarters in Alcobendas (Madrid). This operations centre performs real-time supervision of all the generation and transmission facilities of the national electricity system. The CECOEL operates 24/7, 365 […]

Genesal Energy increases its presence in the UK generator healthcare industry providing the Eastbourne hospital

The design of generator sets for the healthcare sector must meet many criteria, but there are two without which achieving optimum performance would be virtually impossible: power and silence. Genesal Energy Health generator sets complies with both – high power and soundproofing – ensuring normal operation in the event of any power failure or incident. […]

Emergency generating sets for the 4.0 conversion of a large shipyard in Spain

  Technical Data Equipment for saline environment: Stainless steel exhaust gas silencer. Marinised alternator. Alternator anti-condensation resistor. PT100 probes in alternator windings. Motorised air inlet and outlet louvres. Stainless steel ventilation louvers. Surface paint treatment according to ISO12944 – C5M. Container design requested by the customer. Motorised CBs.

Genesal Energy supplies 6 containerized soundproofed generator sets to a data centre in Norway

Characteristics of containerized soundproof generator sets 4.000 L Certified double-walled fuel tank which provides autonomy for more than 9 hours at 100% load. Connections for fuel transfer from an external tank. High-capacity fuel filtration system. Container floor covered with checker plate. Double starter motor. Double set of batteries. Motorised air inlet and outlet louvers. Heat […]