{"id":38835,"date":"2020-01-01T10:30:33","date_gmt":"2020-01-01T10:30:33","guid":{"rendered":"https:\/\/nueva.genesalenergy.com\/en\/?p=38835"},"modified":"2025-01-13T10:05:57","modified_gmt":"2025-01-13T09:05:57","slug":"supply-generator-sets-tres-mesas-wind-farm-mexico","status":"publish","type":"post","link":"https:\/\/genesalenergy.com\/en\/case-studies\/supply-generator-sets-tres-mesas-wind-farm-mexico\/","title":{"rendered":"Supply of generator sets to the Tres Mesas wind farm in Mexico"},"content":{"rendered":"<h2>Another achievement by one of our distributors.<\/h2>\n<p>We have supplied two 82 and 110 kVA units prepared to back-up the auxiliary services of the electrical substations of the Tres Mesas Wind Farm (Phase IV), guaranteeing the correct operation of the electrical systems in response to any eventual failure that may occur.<\/p>\n<h3>Features<\/h3>\n<ul>\n<li>Double-walled 600L fuel tank and automatic fuel transfer system for 48 hours autonomy at 60% load.<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Another achievement by one of our distributors. We have supplied two 82 and 110 kVA units prepared to back-up the auxiliary services of the electrical substations of the Tres Mesas Wind Farm (Phase IV), guaranteeing the correct operation of the electrical systems in response to any eventual failure that may occur. Features Double-walled 600L fuel [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":48921,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"project-single-post.php","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[467,305],"tags":[450,217,616],"pais":[360],"class_list":["post-38835","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-wind-farm","category-case-studies","tag-electrical-substation","tag-mexico","tag-windfarm","pais-mexico-en"],"acf":[],"_links":{"self":[{"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/posts\/38835","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/comments?post=38835"}],"version-history":[{"count":0,"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/posts\/38835\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/media\/48921"}],"wp:attachment":[{"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/media?parent=38835"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/categories?post=38835"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/tags?post=38835"},{"taxonomy":"pais","embeddable":true,"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/pais?post=38835"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}