{"id":32415,"date":"2019-11-04T10:00:29","date_gmt":"2019-11-04T09:00:29","guid":{"rendered":"https:\/\/nueva.genesalenergy.com\/?p=32415"},"modified":"2024-09-26T10:00:05","modified_gmt":"2024-09-26T08:00:05","slug":"made-to-measure-power-thermoelectric-power-plant-sumatra","status":"publish","type":"post","link":"https:\/\/genesalenergy.com\/en\/case-studies\/made-to-measure-power-thermoelectric-power-plant-sumatra\/","title":{"rendered":"Made-to-measure power for a thermoelectric power plant in Sumatra"},"content":{"rendered":"<h2>We\u2019ve designed, manufactured and supplied one of our tailor-made gensets to the Sumbagut (Sibolga Baru) thermoelectric power plant in Sumatra (Indonesia).<\/h2>\n<p><strong>It\u2019s a 400-440 kVA generator set whose goal is to maintain power supply in the event of a mains failure. Our client\u2019s request was, therefore, very clear: the genset had to carry out a basic but vital function: to provide power to the power plant\u2019s emergency loads if ever the mains were to fail.<\/strong><\/p>\n<p>The genset designed by our engineering team for the Indonesian power plant has, amongst other features, anti-condensation heating in the alternator and control panel and three voltage monitors in order to monitor up to three networks.<\/p>\n<h3>Features<\/h3>\n<ul>\n<li>IBLITE communication module for TCP\/IP communication.<\/li>\n<li>Approved steel-steel double-walled 2.500 litre fuel tank.<\/li>\n<li>Remote signal expansion module.<\/li>\n<li>Automatic fuel transfer system.<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>We\u2019ve designed, manufactured and supplied one of our tailor-made gensets to the Sumbagut (Sibolga Baru) thermoelectric power plant in Sumatra (Indonesia). It\u2019s a 400-440 kVA generator set whose goal is to maintain power supply in the event of a mains failure. Our client\u2019s request was, therefore, very clear: the genset had to carry out a [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":49241,"comment_status":"open","ping_status":"closed","sticky":false,"template":"project-single-post.php","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[305,358],"tags":[450,155,487,195,489,255,501],"pais":[499],"class_list":["post-32415","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-case-studies","category-power-plants","tag-electrical-substation","tag-especiales","tag-generator-set","tag-grupos-personalizados","tag-special-generator-set","tag-sumatra","tag-thermoelectric-power-plant","pais-sumatra-en"],"acf":[],"_links":{"self":[{"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/posts\/32415","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/comments?post=32415"}],"version-history":[{"count":0,"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/posts\/32415\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/media\/49241"}],"wp:attachment":[{"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/media?parent=32415"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/categories?post=32415"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/tags?post=32415"},{"taxonomy":"pais","embeddable":true,"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/pais?post=32415"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}