{"id":2847,"date":"2015-08-03T10:56:45","date_gmt":"2015-08-03T10:56:45","guid":{"rendered":"https:\/\/nueva.genesalenergy.com\/?p=2847"},"modified":"2025-10-01T11:14:02","modified_gmt":"2025-10-01T09:14:02","slug":"hospital-alvaro-cunqueiro-3","status":"publish","type":"post","link":"https:\/\/genesalenergy.com\/en\/case-studies\/hospital-alvaro-cunqueiro-3\/","title":{"rendered":"Emergency power solution for the \u00c1lvaro Cunqueiro Hospital"},"content":{"rendered":"<h3>Localization<\/h3>\n<p>Situated in the city of Vigo, north-west of Spain, the new hospital \u00c1lvaro Cunqueiro covers an area \u00a0of 280,000 m\u00b2, has beds for 1,465 patients and will provide healthcare servides to a population of 600,000 people.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-large wp-image-51110\" src=\"https:\/\/genesalenergy.com\/en\/wp-content\/uploads\/sites\/5\/2015\/08\/alvaro-cunqueiro-genesal.jpg\" alt=\"\" width=\"1030\" height=\"490\" srcset=\"https:\/\/genesalenergy.com\/en\/wp-content\/uploads\/sites\/5\/2015\/08\/alvaro-cunqueiro-genesal.jpg 1030w, https:\/\/genesalenergy.com\/en\/wp-content\/uploads\/sites\/5\/2015\/08\/alvaro-cunqueiro-genesal-300x143.jpg 300w, https:\/\/genesalenergy.com\/en\/wp-content\/uploads\/sites\/5\/2015\/08\/alvaro-cunqueiro-genesal-768x365.jpg 768w, https:\/\/genesalenergy.com\/en\/wp-content\/uploads\/sites\/5\/2015\/08\/alvaro-cunqueiro-genesal-705x335.jpg 705w\" sizes=\"auto, (max-width: 1030px) 100vw, 1030px\" \/><\/p>\n<h3>Requirements<\/h3>\n<p>The customers asked GENESAL ENERGY for a full back-up energy solution in case of a mains failure, to cover a total of 11.2 MW (14,000 kVA) with automatic start system and conection to the SCADA room. The solution needs also to comply with high noise attenuation standars to not affect the normal functioning of the hospital when running.<\/p>\n<h3>Solution<\/h3>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-large wp-image-2815\" src=\"https:\/\/genesalenergy.com\/wp-content\/uploads\/2015\/08\/DSF6981-1024x683.jpg\" alt=\"Hospital Vigo generador\" width=\"750\" height=\"500\" \/><\/p>\n<p>Genesal Energy designed, manufactured and commissioned eight gensets to provide the hospital with the 11.2 MW needed:<\/p>\n<ul>\n<li>Six GEN1875H (1,875 kVA\/1,500 kW).<\/li>\n<li>Two GEN1375H (1,375 kVA\/1,100 kW).<\/li>\n<\/ul>\n<p><strong>With the following special features:<\/strong><\/p>\n<ul>\n<li>Automatic start upon mains failure with 3-phase monitoring of mains.<\/li>\n<li>Full control system and automatic transfer switchboards.<\/li>\n<li>Modbus communication between generator\u00a0and SCADA room.<\/li>\n<li>Maximum sound attenuation through -40dB silent exhaust system and sound attenuator.<\/li>\n<li>Automatic fuel transfer system between each individual fuel tank and the main fuel tank of the facilities.<\/li>\n<\/ul>\n<h3>Benefits<\/h3>\n<p>GENESAL ENERGY provided the customer with an fully automatic and an over-the-top reliable solution, designed under a strict specification sheet, both for safety and comfort.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Localization Situated in the city of Vigo, north-west of Spain, the new hospital \u00c1lvaro Cunqueiro covers an area \u00a0of 280,000 m\u00b2, has beds for 1,465 patients and will provide healthcare servides to a population of 600,000 people. Requirements The customers asked GENESAL ENERGY for a full back-up energy solution in case of a mains failure, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":49032,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"project-single-post.php","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[305,355],"tags":[],"pais":[307],"class_list":["post-2847","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-case-studies","category-hospitals","pais-spain"],"acf":[],"_links":{"self":[{"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/posts\/2847","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/comments?post=2847"}],"version-history":[{"count":2,"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/posts\/2847\/revisions"}],"predecessor-version":[{"id":52714,"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/posts\/2847\/revisions\/52714"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/media\/49032"}],"wp:attachment":[{"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/media?parent=2847"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/categories?post=2847"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/tags?post=2847"},{"taxonomy":"pais","embeddable":true,"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/pais?post=2847"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}