{"id":22624,"date":"2018-07-23T08:19:40","date_gmt":"2018-07-23T08:19:40","guid":{"rendered":"https:\/\/nueva.genesalenergy.com\/?p=22624"},"modified":"2025-10-20T13:28:06","modified_gmt":"2025-10-20T11:28:06","slug":"commissioning-the-best-security-protocol-for-the-generator-sets","status":"publish","type":"post","link":"https:\/\/genesalenergy.com\/en\/communication\/articles\/commissioning-the-best-security-protocol-for-the-generator-sets\/","title":{"rendered":"Commissioning, the best security protocol for the generator sets"},"content":{"rendered":"<h5><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-22609 aligncenter\" src=\"https:\/\/genesalenergy.com\/en\/wp-content\/uploads\/sites\/5\/2018\/07\/Puesta-en-marcha-Empalme-II-1-1030x502.jpg\" alt=\"\" width=\"1030\" height=\"502\" srcset=\"https:\/\/genesalenergy.com\/en\/wp-content\/uploads\/sites\/5\/2018\/07\/Puesta-en-marcha-Empalme-II-1-1030x502.jpg 1030w, https:\/\/genesalenergy.com\/en\/wp-content\/uploads\/sites\/5\/2018\/07\/Puesta-en-marcha-Empalme-II-1-300x146.jpg 300w, https:\/\/genesalenergy.com\/en\/wp-content\/uploads\/sites\/5\/2018\/07\/Puesta-en-marcha-Empalme-II-1-768x374.jpg 768w, https:\/\/genesalenergy.com\/en\/wp-content\/uploads\/sites\/5\/2018\/07\/Puesta-en-marcha-Empalme-II-1-1536x749.jpg 1536w, https:\/\/genesalenergy.com\/en\/wp-content\/uploads\/sites\/5\/2018\/07\/Puesta-en-marcha-Empalme-II-1-2048x998.jpg 2048w, https:\/\/genesalenergy.com\/en\/wp-content\/uploads\/sites\/5\/2018\/07\/Puesta-en-marcha-Empalme-II-1-1500x731.jpg 1500w, https:\/\/genesalenergy.com\/en\/wp-content\/uploads\/sites\/5\/2018\/07\/Puesta-en-marcha-Empalme-II-1-705x344.jpg 705w\" sizes=\"auto, (max-width: 1030px) 100vw, 1030px\" \/><\/h5>\n<h6 style=\"text-align: center;\"><em>Genesal performs more than 600 commissioning processes every year, of which most are outside of Spain. <\/em><\/h6>\n<p align=\"justify\"><span lang=\"ES-TRAD\">Making sure that oil, fuel and coolant levels are optimal, that the air inputs are correct or that the unit has arrived to its destination in the same conditions in which it left the factory, are just some of the technical protocol steps to be performed before the commissioning of any generator set, in a fully comprehensive and absolutely essential check-up coordinated by Genesal Energy\u2019s Guillermo Docampo, thanks to an expertise acquired through 40 years of experience in the energy industry.<\/span><\/p>\n<p align=\"justify\">Since the founding of Genesal almost 25 years ago, Docampo and the rest of the engineers in the testing team know every unit that is designed and built in the factory inside and out, because their job is precisely that, making sure nothing fails, and making sure that the generator that a client purchases, which is created according to their specific needs, is in perfect conditions before definitively handing it over to the client. \u201cOur service is akin to that of the MOT, we\u2019re the ones that give the go-ahead\u201d, he says.<\/p>\n<p align=\"justify\"><span lang=\"ES-TRAD\">Commissioning is, therefore, fundamental in order to avoid subsequent issues, to minimize and eliminate risks. While with <b>standard generator sets<\/b>&#8211; like those designed to provide power for a farm or a hotel &#8211; the steps prior to a successful start-up are relatively simple, in the case of <b>special generators\u00a0<\/b>(nuclear plants, hospitals or combined-cycle plants, amongst other installations) the situation is completely different due to the nature of the unit.<\/span><\/p>\n<p align=\"justify\">While with standard units it\u2019s quite normal for the After Sales department to assume this task \u2013 \u201ca good instruction manual and some basic notions are, in most cases, enough\u201d, the expert states &#8211; in the case of special generator sets, the protocol is different: \u201cA Genesal team or a group of technicians that have received training by our staff always travel to the area\u201d, Guillermo Docampo points out.<\/p>\n<h3><strong>More than 40 countries<\/strong><\/h3>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-22613 alignleft\" src=\"https:\/\/genesalenergy.com\/en\/wp-content\/uploads\/sites\/5\/2018\/07\/Puesta-en-marcha-237x300.jpg\" alt=\"\" width=\"237\" height=\"300\" srcset=\"https:\/\/genesalenergy.com\/en\/wp-content\/uploads\/sites\/5\/2018\/07\/Puesta-en-marcha-237x300.jpg 237w, https:\/\/genesalenergy.com\/en\/wp-content\/uploads\/sites\/5\/2018\/07\/Puesta-en-marcha-813x1030.jpg 813w, https:\/\/genesalenergy.com\/en\/wp-content\/uploads\/sites\/5\/2018\/07\/Puesta-en-marcha-768x973.jpg 768w, https:\/\/genesalenergy.com\/en\/wp-content\/uploads\/sites\/5\/2018\/07\/Puesta-en-marcha-1213x1536.jpg 1213w, https:\/\/genesalenergy.com\/en\/wp-content\/uploads\/sites\/5\/2018\/07\/Puesta-en-marcha-1617x2048.jpg 1617w, https:\/\/genesalenergy.com\/en\/wp-content\/uploads\/sites\/5\/2018\/07\/Puesta-en-marcha-1184x1500.jpg 1184w, https:\/\/genesalenergy.com\/en\/wp-content\/uploads\/sites\/5\/2018\/07\/Puesta-en-marcha-557x705.jpg 557w, https:\/\/genesalenergy.com\/en\/wp-content\/uploads\/sites\/5\/2018\/07\/Puesta-en-marcha-scaled.jpg 2021w\" sizes=\"auto, (max-width: 237px) 100vw, 237px\" \/><\/p>\n<p align=\"justify\">At a global scale, the number of commissioning processes performed by Genesal Energy exceeds 600 a year, which means an average of two a day, although the percentage varies greatly according to the world map. On a national level, 30% of Genesal Energy\u2019s services include commissioning, however this percentage is much higher in the international market, where in countries like <strong>Peru they now represent 95<\/strong>%.<\/p>\n<p align=\"justify\">In reality, the nature of the generators that are sold outside of Spain (many of them special generators) explain <strong>this<\/strong><strong>high number of commissioning processes<\/strong>. \u201cIt\u2019s always convenient that the start-up and supervision processes are taken out by the manufacturing company because we and our service technicians know the product better than anyone\u201d, says Docampo, who throughout his career has taken Genesal\u2019s energy to more than 40 countries.<\/p>\n<p align=\"justify\"><strong>Columbia, Ecuador, South Africa, Ghana, Saudi Arabia, Georgia or Qatar <\/strong>are part of thewide client portfolio of the company, where the commissioning service always tends to be included.<\/p>\n<h3><\/h3>\n<h3><strong>Training courses<\/strong><\/h3>\n<p align=\"justify\">Without a doubt, training is a basic tool when it comes to commissioning processes, so that the supervision and control tasks that these check-ups require take place with total guarantee.<\/p>\n<p align=\"justify\">This way, Genesal provides an average of <strong>four courses a year\u00a0<\/strong>in its headquarters in Bergondo (A Coru\u00f1a), although its programmes also include training plans and sessions abroad, giving classes to the personnel that will be in contact with the generator set or will be in charge of its maintenance tasks.<\/p>\n<p align=\"justify\">\u201cThe courses are absolutely necessary in order to have a thorough knowledge of the unit and, therefore, to make sure that everything is okay. We need to guarantee the operation of the generators in times of emergency and in order to achieve this, a good maintenance of the unit is fundamental, which is why adequate training is needed\u201d, Docampo highlights.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Genesal performs more than 600 commissioning processes every year, of which most are outside of Spain. Making sure that oil, fuel and coolant levels are optimal, that the air inputs are correct or that the unit has arrived to its destination in the same conditions in which it left the factory, are just some of [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":23816,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[308,533],"tags":[],"pais":[],"class_list":["post-22624","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-articles","category-communication"],"acf":[],"_links":{"self":[{"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/posts\/22624","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/comments?post=22624"}],"version-history":[{"count":1,"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/posts\/22624\/revisions"}],"predecessor-version":[{"id":52864,"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/posts\/22624\/revisions\/52864"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/media\/23816"}],"wp:attachment":[{"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/media?parent=22624"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/categories?post=22624"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/tags?post=22624"},{"taxonomy":"pais","embeddable":true,"href":"https:\/\/genesalenergy.com\/en\/wp-json\/wp\/v2\/pais?post=22624"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}